1
Salem High School Renovation
Salem Loftier School Renovation Projection The Who,
What, When, Where, and Why (or How) Oct one,
2007 700 PM Salem Loftier Schoolhouse Auditorium
2
Salem High Schoolhouse Renovation
Who initiated the thought?

  • The Salem Schoolhouse Board began considering the
    project need years ago.
  • Facilities Committee appointed past the School
    Board took two years to develop and recommend the
    proposal.
  • Frank Marinace, builder, was selected by the
    School Board on the recommendation of the
    Facilities Commission. Mr. Marinace has been
    designing New Hampshire schools for 34 years.

3
Salem High School Renovation
Who is being served by the projection?

  • Current enrollment is 2258
  • 1607 from Salem
  • 651 from Windham
  • Windham students will leave in 2009
  • Salem High Enrollment in 2009/ten is projected to
    be 1523
  • Goal is to design a high school with enrollment
    capacity of 1600 and core capacity of 2000

iv
Salem Loftier Schoolhouse Renovation
Project Goals

  • To address
  • Safe Needs
  • Security Concerns
  • Educational Programming Needs

five
Salem High School Renovation

  • What do we currently take?
  • The original building opened in 1966 with 140,585
    foursquare feet.
  • A 78,356 foursquare foot addition was built in 1970.
  • A 50,000 foursquare pes Vocational Center was congenital
    in 1987.
  • Total square feet 268,941 s/f
  • Full being renovated 218,941 southward/f
  • Central systems HVAC, plumbing, electrical are
    all more twoscore years old.

6
Salem Loftier School Renovation

  • What do we propose, where, and why?
  • Convert the existing library to office infinite to
  • Remove the library equally corridor issue
  • Direct a secure main visitor entrance to
    Geremonty Dr.
  • Provide better facilities to CTV 6, A.5. and CTV
    17 23
  • Build a new library in the current office space
    with expansion into the courtyard to
  • Provide adequate library facilities
  • Provide limited access for security of students
    and materials.

seven
Salem High School Renovation
8
Salem Loftier School Renovation
EXISTING LIBRARY
NEW LIBRARY
ix
Salem High Schoolhouse Renovation

  • What practise we propose, where, and why?
  • Create a new science wing in the area of the
    current upper gym to
  • Provide science labs that meet standards
  • Correct deficiencies with mechanical, electric,
    and plumbing systems in labs
  • Address structural problems with existing upper
    gym floor
  • Convert the Davis Gym to performing arts space
    to
  • Increase band space to country standards, provide
    facility for ring rehearsals, provide adequate
    storage.
  • Move chorus out of a storage room and provide
    adequate facility.

10
Salem Loftier School Renovation
eleven
Salem High School Renovation

  • What practice we advise, where, and why?
  • Expand and renovate the Seifert Auditorium using
    the vacated band space for needed storage, prep,
    and costume irresolute to
  • Create a meliorate functioning venue for students
    and the community
  • Help regulate access points
  • Renovate each and every classroom and hallway to
  • Remove dated finishes and address asbestos items
  • Provide updated HVAC and new utilities
  • Provide new and more than efficient lighting
  • Install communications and information systems

12
Salem Loftier School Renovation

  • What practise we suggest, where, and why?
  • Replace the eliminated gymnasiums with a new,
    stand lone facility to
  • Supervene upon the spaces taken for new science labs and
    performing arts.
  • Allow outside groups access without accessing the
    high schoolhouse
  • Provide renovated locker room areas
  • Provide comparable space facilities to those that
    exist today

xiii
Salem High School Renovation
14
Salem High Schoolhouse Renovation

  • WHY and Why Now?
  • Safety Concerns
  • No sprinkler organization
  • Deteriorated systems
  • Declining infrastructure
  • Security Concerns
  • Twenty-three entrances/exits
  • Accessibility throughout day and evening hours
  • No security organisation

15
Salem High School Renovation

  • WHY and Why At present?
  • Educational Programming
  • Substandard classrooms
  • Deficient Science Labs
  • Deficient Special Instruction Space
  • Substandard library
  • Substandard Performing Arts Areas

16
Salem High School Renovation

  • WHY and Why At present?
  • Financial Advantages
  • Portable Classrooms - Speed renovation past half-dozen
    months and save an estimated 600,000
  • Boosted tuition costs of 600,000 offset AE
    fees
  • Construction costs increasing at half-dozen/yr

17
Salem High School Renovation
How much will this toll and how does information technology compare
to other such projects?

  • Total working estimate is 41 meg
  • The state will pay 30
  • total to Salem 28.7 million

This cost includes the i.511 million existence
requested in March, 2008
xviii
Salem High School Renovation

  • How much will this toll and how does it compare
    to other such projects?

Exeter High Schoolhouse Quondam Building 150,000 southward/f New
Building 340,000 s/f Toll 42,000,000
excluding state Architect fee 2,400,000 Year
Completed Fall, 2006 Winnacunnett Loftier
School Old Edifice 150,000 s/f New Building
205,000 due south/f Price 26,800,000 Twelvemonth Completed
June, 2005
nineteen
Salem High School Renovation

  • How much volition this cost and how does information technology compare
    to other such projects?

Nashua South High School Former Building 369,000
s/f New Edifice 430,000 south/f (includes 63,000
s/f gymnasium) Cost 63,775,000 Builder
3,400,000 Year Completed 2004
20
Salem High School Renovation
How much will this cost me?
For a home assessed at 300,000 for a 20 year
bond at a 5 interest charge per unit
Year 1 - 63.27 (interest simply) 5.27/month
Twelvemonth two - 144.52 12.04/month
Total in the highest year Year 2 207.79 or
17.32/month in 2010-2011
21
Salem High Schoolhouse Renovation
How much will this cost me?
In 2009-2010 we volition lose v.6M in revenue from
Windham
Estimated tax impact on a home assessed at
300,000 with renovation project 363/year or
30.25/mo
Estimated tax impact on a abode assessed at
300,000 without a loftier schoolhouse renovation projection
300/twelvemonth or 25/mo
22
Salem Loftier School Renovation
How much will this toll me?
2010-2011 volition encounter the largest tax impact. With
estimates for all operating expenses

  • revenue enhancement impact on a home assessed at 300,000 with
    renovation project 204/year or 17/mo (Two yr
    full increase of 567.00)
  • tax impact on a home assessed at 300,000
  • without a high school renovation projection
    sixty/year or 12/mo (2 yr total increase of
    360.00)

23
Salem Loftier Schoolhouse Renovation
What is the upshot of non doing the projection?
Prices will escalate 6 to 10 per year

  • Major systems problems will be addressed in
    piecemeal way
  • Electrical systems are outdated
  • Mechanical systems are in disrepair
  • The roof/ceiling tiles/floor tiles will need to
    be replaced
  • Structural deficiencies must exist corrected
  • Data communication systems must be updated
  • Security should exist added

To be eligible for 30 state reimbursement funds,
projection costs must be equal to 25 of the
replacement cost of the building or v 1000000 ,
whichever is less. Doing these repairs as stand up
alone projects will cost yous more!
24
Salem High School Renovation
When is this planned?

  • Public Information Endeavour At present
  • March, 2008 Request funds for schematic designs
    of renovations. Begin preparing structure
    documents complete necessary detail to exist able
    to provide firm cost estimate for construction
    bond (no surprises)
  • March, 2009 Asking approving of construction
    bond
  • July, 2009 Work begins
  • August, 2011 Piece of work completed

25
Salem High School Renovation
How tin I become more involved?

  • Scout for information from the Salem School Board
  • Get informed through PTA or other groups
  • Watch for information on the commune web site
    www.salemschooldistrictnh.com
  • Attend the Deliberative Session on February 7,
    2008, at 700 p.thousand. at Salem High School

You might even have a presentation y'all'd like to share with others. If and then, simply upload it to PowerShow.com. Nosotros'll catechumen it to an HTML5 slideshow that includes all the media types you've already added: audio, video, music, pictures, animations and transition furnishings. And so yous can share it with your target audience too as PowerShow.com's millions of monthly visitors. And, over again, it'south all gratis.

PowerShow.com is a leading presentation sharing website. It has millions of presentations already uploaded and available with 1,000s more being uploaded by its users every 24-hour interval. Whatever your surface area of involvement, here you'll be able to detect and view presentations you'll love and possibly download. And, best of all, it is completely free and easy to use.

About the Developers

PowerShow.com is brought to you by CrystalGraphics, the award-winning developer and market-leading publisher of rich-media enhancement products for presentations. Our production offerings include millions of PowerPoint templates, diagrams, animated 3D characters and more.

hebertafruldeste.blogspot.com

Source: https://dev.powershow.com/view/12350d-ZWIyO/Salem_High_School_Renovation_powerpoint_ppt_presentation

0 Response to "Salem High School Seifert Performing Arts Center Salem High School Renovation"

Post a Comment

Iklan Atas Artikel

Iklan Tengah Artikel 1

Iklan Tengah Artikel 2

Iklan Bawah Artikel